$0.00 0

Cart

No products in the cart.

Call Us Today
Call Us Today
$0.00 0

Cart

No products in the cart.

PFT800

Heat Treating System

Thumbnail 5
previous arrow
next arrow
Thumbnail 5
Thumbnail 2
Thumbnail 3
FHT350_PHT350_UnitOnly_Web
previous arrow
next arrow

Heat-Treating Made Simple: The PFT800 Does It All

Nyle’s PFT800 Heat-Treating System is designed for flexibility, efficiency, and ease of use, making it suitable for treating everything from pallets to firewood. Built within a durable 40-foot refrigerated shipping container, these systems provide all the equipment necessary for heat-treating operations. With indirect gas-fired furnaces running on natural gas or propane, Nyle’s heat treaters are both efficient and safe, requiring no boiler.
Starting at:
$79,995.00
Complete Turn-Key System
Housed in a 40-foot refrigerated shipping container, the system includes everything needed for immediate heat-treating operations
Safe, Indirect Gas-Fired Furnace
Indirect gas-fired design prevents direct flame contact, offering safer heat-treating compared to direct-fired systems while maintaining efficiency.
Advanced Control System
Equipped with precise controls with data logging, the system ensures compliance with evolving regulations & supports growing operational needs.
Durable Construction
Manufactured with high-quality materials to reduce maintenance and repair time, allowing you to focus on maximizing productivity.

Specifications

Load Capacity 350 Pallets/ 6-8 Cords
Max Temperature 180° F
Drying Time — Winter Drying: 3–5 Days / Heat Treating: 3–6 Hours
Drying Time — Summer Drying: 2–3 Days / Heat Treating: 2–4 Hours
Energy Output 800,000 Btu/hr
Number of Fans One 36", 7.5 HP
Number of Vents Two Duct Vents
Dimensions 40' L × 8' W × 9' 6" H
Shipping Weight 11,000 lbs
Power Requirements 480V Three Phase, 60 Hz
Fuel Type Natural Gas or Propane

The PFT800's burner has an output of 800,000 Btu/hr

No, we do not offer firewood baskets as there can be many variances, but we do offer complete plans to build your own.

The drying time for pallets and firewood varies by season and method: winter drying typically takes 3 to 5 days (or 3 to 6 hours for heat treating), while summer drying is faster at 2 to 3 days (or 2 to 4 hours for heat treating).

Controls

Our Heat-Treating control system provides the tools to ensure proper and efficient heat treatment every cycle.

The control system allows complete control over the set points and climate during the cycle, even automatically turning off the equipment when heat treating has been completed.

Automatic recording allows users to generate printable reports for certification & shipping requirements.

Product Highlights

© Copyright 2026 Nyle Systems, LLC
/
Sitemap

Choose your country